Project Overview

We were engaged as General Contractor to assess current systems, assemble the project team and we worked with the municipality, and to strict bank protocols.

Project scope included demolition and recycling of concrete, asphalt and interior floor structure to access and upgrade the water supply system. We then placed and finished all surfaces to match existing.

All work was done without the closure of the bank while ensuring all security risks were mitigated.

Completed: 01/02/2020